Case Study

Gorey Nursing Home

A state-of-the-art, 90-bedroom nursing home in Clonattin, Gorey, showcases excellence and innovation in healthcare construction.
Gorey Nursing Home

Project Overview

Superstructure Works: May 2022
Completion of ICF Package: October 2022

The Amvic Ireland team, through the use of Insulated Concrete Formwork (ICF) contributed towards sustainable and efficient construction of a modern 90-bedroom nursing home in Clonattin, Gorey, Co. Wexford. 

The project demonstrates Amvic’s capacity to meet the complex demands of healthcare construction by delivering tailored, high-quality building solutions. Collaborating closely with stakeholders, the team leveraged the benefits of ICF technology to ensure superior energy efficiency, structural integrity, and comfort, all key considerations for healthcare facilities. 

This initiative is part of Amvic’s broader portfolio of healthcare projects, which includes partnerships on nursing homes in Clondalkin, Gorey, and Rolestown in Swords. These projects require Amvic’s detailed knowledge and understanding of the specific needs of the healthcare industry, which can be supported through innovative construction techniques and meticulous attention to regulatory and operational requirements. 

Design Team
Reddy Architecture + Urbanism
Consulting Engineers:
MUIR Associates
Fire Safety Consultants
ORS
Engineering Design Consultants
EDC

Advantages of Amvic ICF in healthcare facilities

1

Exceptional build quality and efficiency

Amvic ICF systems are renowned for their superior build quality, reducing construction times significantly while ensuring robust structural integrity. The nursing home in Clonattin benefited from rapid progress on-site without compromising on quality.

2

Enhanced performance

The use of Amvic ICF technology ensures excellent airtightness and thermal efficiency, which are critical for healthcare facilities. Amvic ICF systems also provide outstanding acoustic performance, creating a comfortable and quiet environment for residents. These features contribute to lower operational costs and enhanced sustainability, making Amvic ICF the preferred choice for healthcare developments. 

3

Comprehensive support and collaboration

Our dedicated technical team works closely with clients, architects, engineers, and fire consultants from the initial design phase through to project completion to ensure that every aspect of the construction process is meticulously planned and executed, resulting in a seamless build process and an exceptional end result. 

4

Significant commercial savings

The efficiencies achieved through Amvic ICF technology translate into substantial commercial savings for our clients. Reduced build times, coupled with lower energy costs due to superior thermal performance, make our solutions highly cost-effective for long-term healthcare projects. 

Other Projects

Let’s connect to discuss the possibilities for your next project. 

For more information, or to schedule a meeting, please contact our sales team at sales@amvicireland.com. 

Together, we can build a sustainable, high-performance future for healthcare in Ireland and beyond.