Case Study

Cromwellsfort Road Apartment

A unique 4-storey, 20-unit apartment block delivered from foundation to handover in just 24 weeks.
Cromwellsfort Road Apartment

Project Overview

Superstructure Works: TBC

The Cromwellsfort Road site presented unique challenges due to its location on a constrained corner with limited access. Conventional building methods would have significantly increased the complexity and timeline of the project. However, by choosing Amvic ICF, the project team overcame these hurdles with ease.

Architects
PD Lane Architects
Engineers
Lohan & Donnelly Consulting Engineers
Main Contractor
MCH - Mount Collins Homes
ICF Installation Team
AF Construction Ltd

The lightweight nature of the ICF simplified on-site handling, especially in a tight space. 

The ICF build method required considerably less scaffolding, contributing to both safety and cost-efficiency. 

The absence of heavy machinery requirements was particularly beneficial, given the access restrictions.

These features combined to deliver a speedier, cleaner, more streamlined construction process that aligned perfectly with the project’s requirements.

Beyond speed and efficiency, the use of Amvic ICF contributed to the long-term performance and sustainability of the building. With superior thermal insulation, energy efficiency, and durability, the apartments will provide enduring value to both residents and owners. 

For more information, or to schedule a meeting, please contact our sales team at sales@amvicireland.com. 